Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Bayraktar, M E, Arif, F, Ponder, D, Prozzi, J and Mahmoud, N V (2016) Opportunities for Value Extraction Projects in Highway Rights-of-Way and Development of Feasibility Assessment Tool. Journal of Construction Engineering and Management, 142(08).

da Rocha, C G, Kemmer, S L and Meneses, L (2016) Managing Customization Strategies to Reduce Workflow Variations in House Building Projects. Journal of Construction Engineering and Management, 142(08).

González-Jorge, H, Martínez Sánchez, J, Díaz-Vilariño, L, Puente, I and Arias, P (2016) Automatic Registration of Mobile LiDAR Data Using High-Reflectivity Traffic Signs. Journal of Construction Engineering and Management, 142(08).

Hajifathalian, K, Howell, G, Wambeke, B W, Hsiang, S M and Liu, M (2016) “Oops” Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities. Journal of Construction Engineering and Management, 142(08).

Hanna, A S, Ibrahim, M W, Lotfallah, W, Iskandar, K A and Russell, J S (2016) Modeling Project Manager Competency: An Integrated Mathematical Approach. Journal of Construction Engineering and Management, 142(08).

Hwang, S, Park, M, Lee, H and Lee, S (2016) Hybrid Simulation Framework for Immediate Facility Restoration Planning after a Catastrophic Disaster. Journal of Construction Engineering and Management, 142(08).

Love, P E D, Teo, P, Morrison, J and Grove, M (2016) Quality and Safety in Construction: Creating a No-Harm Environment. Journal of Construction Engineering and Management, 142(08).

Luo, X, Li, H, Huang, T and Skitmore, M (2016) Quantifying Hazard Exposure Using Real-Time Location Data of Construction Workforce and Equipment. Journal of Construction Engineering and Management, 142(08).

Nassar, N and AbouRizk, S (2016) Introduction to Techniques for Resolving Project Performance Contradictions. Journal of Construction Engineering and Management, 142(08).

Singhaputtangkul, N and Zhao, X (2016) Applying a Fuzzy Consensus Scheme to Enhance the Group Decision Making of a Building Envelope Design Team. Journal of Construction Engineering and Management, 142(08).

  • Type: Journal Article
  • Keywords: Fuzzy set theory; Fuzzy consensus scheme; Group decision making; Building design team; Project planning and design;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001142
  • Abstract:
    This study applies a fuzzy consensus scheme integrated with a multicriteria decision making method and fuzzy set theory to mitigate groupthink and disagreements among members of a building envelope design team. This fuzzy consensus scheme consists of freezing conditions and a standardized procedure to govern group decision making. The study employs a case study as a research design to test effectiveness of the fuzzy consensus scheme in mitigating groupthink and disagreements among the building design team members. In the case study, the design team is engaged and then tasked to apply the fuzzy consensus scheme when assessing different building envelope designs of a representative building project. A semi-structured interview is conducted to collect perspectives of the design team members regarding the effectiveness of the fuzzy consensus scheme applied in the case study in relation to their previous experience in similar actual projects. Results from the case study suggest that the fuzzy consensus scheme is useful in promoting group cohesiveness and generation of a variety of decision solutions. The scheme also assists the team members to express their opinions, listen to each other voices, and seek the optimal solutions that everyone in the team agrees with. These as a whole help mitigate both groupthink and disagreements among the team members. The main contributions of this study lie in the achievement of more effective group decision making and agreed design solutions. Future studies can incorporate the fuzzy consensus scheme into decision support tools to promote integration among project team members in several project development phases.

Tymvios, N and Gambatese, J A (2016) Direction for Generating Interest for Design for Construction Worker Safety—A Delphi Study. Journal of Construction Engineering and Management, 142(08).

Weidman, J, Dickerson, D E and Koebel, C T (2016) Effective Intervention Strategy to Improve Worker Readiness to Adopt Ventilated Tools. Journal of Construction Engineering and Management, 142(08).

Xiong, W and Zhang, X (2016) The Real Option Value of Renegotiation in Public–Private Partnerships. Journal of Construction Engineering and Management, 142(08).